TREMproof 215 SBS/Stoncor Middle East LLC/2026-09-14
TREMproof 215 SBS/Stoncor Middle East LLC/2026-09-14
Open the PDF · HPD 46582
Expiration Date: 2029-09-14
TREMproof 215 SBS® is a High Build bituminous rubberized liquid waterproofing membrane. TREMproof 215 SBS is highly recommended for water proofing application for the building structure including foundation, kitchen and toilet floors…
-
Venice/Nassimi LLC/2026-06-23
Venice/Nassimi LLC/2026-06-23
Open the PDF · HPD 45599
Expiration Date: 2029-06-23
PVC
-
Decoy/Nassimi LLC/2026-06-01
Decoy/Nassimi LLC/2026-06-01
Open the PDF · HPD 45197
Expiration Date: 2029-06-01
PVC
-
Classic/Nassimi LLC/2026-05-15
Classic/Nassimi LLC/2026-05-15
Open the PDF · HPD 44982
Expiration Date: 2029-05-15
PVC
-
EZPour 158/Concord Terrazzo Company/2026-02-13
EZPour 158/Concord Terrazzo Company/2026-02-13
Open the PDF · HPD 43497
Expiration Date: 2029-02-13
2-part colored Epoxy Resin System with glass / stone / shell aggregates
-
V542 Xtrordinaire ND/Morbern Inc./2026-02-17
V542 Xtrordinaire ND/Morbern Inc./2026-02-17
Open the PDF · HPD 43496
Expiration Date: 2029-02-04
-BASED FABRIC AND FILM PRODUCTS, USED IN THE BUILDING AND CONSTRUCTION, AUTOMOTIVE, FASHION AND MANY OTHER INDUSTRIES.
-
2R60-MELLOHIDE EVM/Morbern Inc./2026-02-13
2R60-MELLOHIDE EVM/Morbern Inc./2026-02-13
Open the PDF · HPD 43498
Expiration Date: 2029-01-29
PRODUCT DESCRIPTION:POLYMER-BASED FABRIC AND FILM PRODUCTS, USED IN THE BUILDING AND CONSTRUCTION, AUTOMOTIVE, FASHION AND MANY OTHER INDUSTRIES.
-
Pozzotive IF/Urban Mining CT, LLC/2026-01-28
Pozzotive IF/Urban Mining CT, LLC/2026-01-28
Open the PDF · HPD 43234
Expiration Date: 2029-01-13
Pozzotive® IF is a functional industrial filler used in paints and coatings, polymers, plastics, resins, sealants and caulks. It is used in place of non-renewable mined natural resources.
-
Rapidex HL-9672-LT/H.B. Fuller Company/2026-01-13
Rapidex HL-9672-LT/H.B. Fuller Company/2026-01-13
Open the PDF · HPD 43020
Expiration Date: 2029-01-08
This patented hot melt moisture cure product is a one-component polyurethane, 100% solids hot melt adhesive. For use in bonding of leather, wooden material, metal, glass, textiles, PUR-foams, numerous membrane films and plastics like PVC…
-
Data Center Gordon Grid ChaseWall/Gordon Inc./2025-12-19
Data Center Gordon Grid ChaseWall/Gordon Inc./2025-12-19
Open the PDF · HPD 42785
Expiration Date: 2028-12-19
Gordon invented structural ceiling grid for the data center industry. Over a decade later, Gordon continues to develop products that the industry requires to manage the new reality presented with higher density requirements. The Gordon…